The data center talent shortage keeps growing because construction is expanding far faster than the experienced workforce. Census Bureau data shows data center construction spending at a $96.5 billion annual rate in September 2026, while total US construction spending fell 2.7% year on year. This report sets out where the work is, which roles are short and why.
- Data center construction spending reached a $96.5 billion seasonally adjusted annual rate in September 2026, up about 90% year on year.
- JLL counted more than 66 GW under construction across North America at midyear 2026, with 95% pre-committed.
- Frontier markets such as West Texas hold 77% of capacity under development, far from established labor pools.
- Uptime Institute’s 2026 survey found more than half of operators report difficulty finding qualified candidates.
- AFCOM’s 2026 survey found 87% of respondents report workforce gaps affecting operations.
How fast data center construction is growing
Data center construction is growing at a pace no other building sector matches. The Census Bureau’s September 2026 figures put private data center construction at a $96.5 billion annual rate, the highest since the series began in 2014. AGC’s analysis of the same release found data center spending up 90% year on year.
The rest of construction is moving the other way. Total US construction spending was $2.19 trillion at an annual rate in September 2026, 2.7% below a year earlier. Contractors are moving people from shrinking sectors into data centers, but few of those people have mission critical experience.
Is the growth likely to slow soon?
Not on current evidence. JLL’s midyear 2026 report found 95% of the 66 GW under construction in North America already pre-committed to tenants, with vacancy holding at 1% for a third straight year. Committed capacity has to be built, energized and commissioned, so labor demand is locked in for several years.
Where the construction is concentrated
Construction is concentrated in Texas, Virginia and a ring of frontier markets. JLL’s August 2026 release put Texas at 26 GW of existing and under-construction capacity, ahead of Virginia at 13 GW. Frontier markets account for 77% of capacity under development, with West Texas among the largest beneficiaries.
“The market absorbed 25 gigawatts in just six months.” Andy Cvengros, JLL, August 11, 2026
Frontier markets are the root of the shortage. A campus in West Texas has no local pool of electrical superintendents or commissioning engineers, so every senior hire must relocate or travel. Our West Texas and Abilene hiring page covers that market in detail.
Why do frontier markets struggle to staff projects?
Frontier markets struggle because they had little data center construction a decade ago, so the specialist workforce never formed locally. Contractors fly in leadership, pay per diem and compete with neighboring campuses for the same people. Retention suffers when a rival site offers more money a few miles away.
How the shortage varies by market
The shortage varies by market because each hub sits at a different stage of growth. JLL’s midyear 2026 release said Dallas Fort Worth delivered over 2 GW while absorbing even more, and Phoenix absorbed 442 MW with 1.7 GW under construction. Columbus compressed to 0.1% vacancy despite significant new supply coming online.
Established hubs such as Dallas Fort Worth have deeper local talent, but demand there is high enough that contractors still compete hard for the same superintendents and electrical leads. Our Dallas Fort Worth hiring page and Phoenix and Mesa hiring page cover those markets.
Are established markets easier to hire in?
Established markets are easier for trade and technician roles but not for senior leadership. A deeper local pool shortens the search for foremen and technicians. Senior project managers, commissioning managers and general superintendents remain scarce everywhere, because the number of people who have delivered a hyperscale building has not grown as fast as demand.
What operators and contractors report
Operators report that hiring is now one of their hardest problems. Uptime Institute’s 2026 Global Data Center Survey found more than half of respondents have difficulty finding qualified candidates for open jobs, and turnover remains persistent. Its 2025 staffing survey found almost a quarter named staff retention as their organization’s greatest challenge.
AFCOM’s 2026 survey found 87% of respondents report workforce gaps affecting operations, with data center engineers the most in-demand role at 56%. Construction and operations draw on overlapping skills, so a shortage on one side tightens the other. Many commissioning engineers move into operations after a few campuses, which removes them from the construction pool entirely.
Which roles are hardest to fill
The hardest roles to fill sit where experience cannot be shortcut. Commissioning managers who have led integrated systems testing, electrical superintendents who have energized a hyperscale building and critical power specialists who know UPS and switchgear start-up are all scarce. Each one takes several full campus builds to develop.
Which construction roles are most exposed?
Electrical roles are most exposed because power drives both cost and risk on a data center. Electrical project managers, superintendents, foremen and estimators all face demand from contractors and equipment vendors at once. Commissioning follows close behind, since every megawatt must be tested before handover to a tenant.
See our electrical superintendent hiring page and commissioning manager hiring page for what contractors screen for.
Why the shortage persists
The shortage persists for three connected reasons. Experience on live mission critical sites takes years to build. Frontier campuses sit far from existing labor pools. And contractors, vendors and operators all recruit from the same small group of people, so poaching moves talent around without adding to it. Growth in data center construction spending outpaces all three fixes.
Will training programs close the gap?
Training programs help at the trade and technician level but cannot quickly produce senior leaders. A commissioning manager or general superintendent needs several full builds behind them. Until today’s apprentices and junior engineers gain that experience, senior roles will stay short, and contractors will keep paying a premium to secure them.
What the shortage means for pay
The shortage pushes data center pay well above national medians. BLS put the construction managers median at $114,990 in May 2025, yet a Temple, Texas brief published by James Preston offered a $200,000 to $250,000 base for a senior project manager. ZipRecruiter showed $147,461 for data center commissioning engineers.
How contractors can hire through the shortage
Contractors can hire through the shortage by planning earlier and widening the search beyond local candidates. Preston Recruitment advises clients to follow five steps on mission critical briefs. Each step shortens time lost to vacancies, which matters most when a handover date carries financial penalties.
- Step 1 Map senior hires against the program schedule before groundbreaking.
- Step 2 Recruit nationally for roles a frontier market cannot supply.
- Step 3 Set ranges from data center benchmarks, not general construction medians.
- Step 4 Build per diem, relocation and completion bonuses into offers.
- Step 5 Use retained search for general managers and project executives.
Method and sources
Spending figures come from the Census Bureau’s September 2026 construction release and AGC’s analysis of it. Capacity figures come from JLL’s North America Data Center Report Midyear 2026. Workforce findings come from Uptime Institute’s 2025 and 2026 surveys and AFCOM’s 2026 survey. Pay figures come from BLS, ZipRecruiter and published Preston Recruitment briefs.
Frequently asked questions
How much is being spent on data center construction?
The Census Bureau put private data center construction at a $96.5 billion seasonally adjusted annual rate in September 2026, the highest since the series began in 2014. AGC’s analysis found spending up 90% year on year, while total US construction spending fell 2.7% over the same period.
Is there a shortage of data center construction workers?
Yes. Uptime Institute’s 2026 survey found more than half of operators report difficulty finding qualified candidates, and AFCOM’s 2026 survey found 87% report workforce gaps affecting operations. The shortest supply is in senior electrical, commissioning and site leadership roles, where experience takes several campus builds to develop.
Where is data center construction growing fastest?
Construction is growing fastest in Texas and in frontier markets. JLL’s August 2026 release put Texas at 26 GW of existing and under-construction capacity, ahead of Virginia at 13 GW. Frontier markets such as West Texas, Ohio and Louisiana account for 77% of capacity under development.
Which data center roles are hardest to hire?
Commissioning managers with integrated systems testing experience, electrical superintendents who have energized hyperscale buildings and critical power specialists are among the hardest to hire. Electrical project managers and estimators are also short, because contractors and equipment vendors compete for the same experienced people across every major market.
How can contractors compete for scarce talent?
Contractors compete best by hiring earlier, recruiting nationally and setting ranges from data center benchmarks rather than general construction medians. Per diem, relocation and completion bonuses matter in frontier markets. For senior leadership, retained search gives contractors a dedicated process and access to candidates who are not actively applying.
Hiring for a data center program? Send us your brief or see our data center and mission critical recruitment services.