Data center recruiters at Preston Recruitment work state by state, because hiring pressure follows where projects break ground. Each location page names verified projects, their capacity or value, and the roles those builds need. Start with Texas, where our US direct hire desk is based, then Virginia, Georgia, Arizona, Ohio and Illinois.
- JLL counted 66 GW of data center capacity under construction across North America at midyear 2026, with 95% of it pre-committed.
- Texas holds 26 GW of existing and under-construction capacity against 13 GW in Virginia, according to the JLL midyear 2026 report.
- CBRE tracked 7,481 MW under construction across its eight primary North American markets in the first half of 2026, with vacancy at 1.4%.
States and metros we recruit in
Preston Recruitment covers six states where data center construction is concentrated, with metro pages where we can name live projects. Texas carries four metro pages because our Dallas base and live roles sit there. Each state page gives its metros a parent and summarizes statewide demand with dated figures.
- Texas with Dallas Fort Worth, West Texas and Abilene, Austin and Central Texas and Houston
- Virginia
- Georgia with Atlanta
- Arizona with Phoenix and Mesa
- Illinois with Chicago
Why location changes the hire
Location changes a data center hire because pay, travel terms and competition for the same people vary sharply by market. The Bureau of Labor Statistics put the May 2025 median for construction managers in Texas at $101,470, which is 11.8% below the national median of $114,990. Per diem and travel packages close that gap on remote campuses.
Remote campuses such as Abilene draw crews from several states, so travel allowances and rotation schedules matter as much as base pay when a candidate weighs an offer.
A metro page only goes live when we can name a project with a value or capacity figure, or a live Preston role in that market. That rule keeps every page specific to its market. Our hiring pages by role carry the national view.
Frequently asked questions
Which state has the most data center capacity being built?
Texas leads, with 26 GW of existing and under-construction data center capacity in the JLL midyear 2026 report, double the 13 GW in Virginia. Texas projects such as the Abilene campus and the CloudBurst site near San Marcos run at gigawatt scale, which drives demand for superintendents, electrical leads and commissioning managers.
Do you recruit outside the states listed?
Yes. Preston Recruitment places people on traveling projects across the US, and many superintendents and commissioning leads move between campuses in several states. The location pages cover markets where we can name verified projects. If your site sits elsewhere, send the brief and we’ll scope the search the same way.
How tight is the data center market right now?
Very tight. CBRE reported vacancy of 1.4% across its eight primary North American markets in the first half of 2026, with 7,481 MW under construction. Almost all of that capacity is leased before completion, so contractors face fixed handover dates and little room for an unfilled leadership role.